Project Description
- Excavated foundations, blinding and backfilled around rising walls for floor slabs.
- Stone to be placed to correct level and compacted by use of vibrating plate. Stone sub base , blinded with sand. Crew to lay geotextile on top of sand base.
- Radon sumps and membrane.
- Steel fixing and shuttering/ Pouring and finishing of insulated concrete slab.
- Care will be taken in moving concrete vibrator from place to place
- Rotation/breaks to be deployed for operatives using the concrete poker
- Underground foul and storm drainage: Reduce ground to required level, Shutter for pads if . Pour concrete, Carry out drainage alteration to storm line, excavate down to pipeline . Install manhole and raise lid to required level.
Key Challenges
- Working at height – roofs and steel structure
- Big concrete area poured the concrete floor